| Aircraft Commander | |
| Co-pilot | |
| Flight Engineer | |
| Flight Engineer | |
| Navigator | |
| Flight Director | Ian Sears |
| Flight Director | |
| Data Technician | |
| Engineer | |
| Engineer | |
| Electronics Technician | |
| Dropsonde Operator |
| Lead Scientist | Mike Black (HRD) |
| Workstation | Paul Leighton (HRD) |
| Observer | Pete Curran (FEMA) |
| Observer | Diana Goeller (NHC) |
|
|
Mission Plan :
NOAA 43RF will ferry to San Diego, CA for a series of Decay missions into Hurricane Dora in the eastern Pacific. The P-3 will leave MacDill AFB, FL 1600 UTC and will land at San Diego NAS, CA (KNZY) by 2300 UTC.
Mission Summary :
| Take off | Landing
| MacDill AFB, FL | 21/16:33 UTC
| San Diego NAS, CA | 21/22:50 UTC
| | ||
NOAA 43RF ferried to San Diego, CA for a series of Decay missions into Hurricane Dora in the eastern Pacific. The P-3 left MacDill AFB, FL 1635 UTC and landed at San Diego NAS, CA (KNZY) at 2301 UTC.
Problems :
|
Track |
Temperature and Moisture |
Wind and Atlitude |