| Aircraft Commander | |
| Co-pilot | |
| Flight Engineer | |
| Flight Engineer | |
| Navigator | |
| Flight Director | |
| Flight Director | |
| Data Technician | |
| Engineer | |
| Engineer | |
| Electronics Technician | |
| Dropsonde Operator |
| Lead Scientist | Paul Reasor (HRD) |
| Radar Scientist | Kathryn Sellwood (HRD) |
| Observer | Zach Gruskin (HRD) |
![]() Proposed track |
Mission Plan :
NOAA 42RF will fly an Tail Doppler Radar mission into Tropical Disturbance AL90 in the Gulf of Mexico. The P-3 will leave MacDill AFB, FL 8000 UTC and will recover back at MacDill by 1600 UTC.
Problems :
Cancelled due to mechanical problems
Page last updated July 29, 2011
Return to Mission page.