| Aircraft Commander | |
| Co-pilot | |
| Flight Engineer | |
| Flight Director | |
| Flight Director | |
| Dropsonde Operator | |
| Dropsonde Operator | |
| Dropsonde Operator | |
| Dropsonde Operator |
| Lead Project Scientist | Rob Rogers |
| Dropsonde Scientist | Kathryn Sellwood |
| Radar Scientist | Shirley Murillo |
![]() |
Mission Plan :
The P-3 is tasked by HRD to carry out a TDR mission into Hurricane Bill east of Barbados. The aircraft will depart Barbados at 08:00 UTC and arrive back in Barbados by 16:00 UTC.
Mission Summary :
Problems :
Flight cancelled due to mechanical problems.
Page last updated August 14, 2009
Return to Mission page.